Understand Model Inspire
SedStrat Lab builds the tools geoscientists work subsurface data with — core, well logs, grids, and seismic — for exploration, research, and drilling projects. We offer digital solutions to ease daily geoscience work.
Who we are
SedStrat Lab is a small technical outfit working in subsurface geology. We build software for exploration, research, and drilling projects — digital solutions to ease daily geoscience work.
Every application on this page started as something a project of ours needed. We built it, used it against real data, and cut away everything that got in the way of the answer. That loop is the whole company — and it is the only real reason to trust a piece of geoscience software: someone had to stake a result on it first.
Open, readable formats throughout — CSV, LAS, portable project folders. Nothing we build holds your work hostage, and nothing we build needs us to open it later.
Every result traces back to the data it came from. The project is yours to open, check, and carry forward — not a screenshot of one.
We are not a software house that hired a geoscientist. We use every application we ship on our own projects — which is why the steps that do not earn their place get removed.
What we offer
Each one built around the same two convictions: the work has to be reproducible, and the data has to stay yours.
1/3
Contact
Ask about a trial, a licence, or whether one of our applications fits the way you already work. Mention the data you handle and what you need to get done — it saves a round trip.
If our tools are not the right fit, we will say so.
One email, straight to us. Tell us the data you work with and what you need to get done — the message opens with a short prompt so nothing important gets left out.
Contact usOpens your mail app. Prefer to write it yourself? We are at hello@sedstrat-lab.com — we reply within two working days.